|
David Nelson's Web Site
|
|
|
Paul's Schooner Restoration
As you can see from this image the model required
significant work to bring it to pristine condition. March 7, 2026 The hull and deck were stripped of old paint and
repainted. All of the woodwork was replaced and the To complete the restoration new sails will be made and
mounted on the mast. Rigging will be added to March 23, 2026 The restoration is complete. Profile of the model. The hull and deck have been
coated with Epoxy to waterproof
The hatch. The aft deck showing the lines that control the rudder when the main sail shifts in the wind.
The bowsprit and clew of the jib sail. The masts
and rigging are detachable from the deck so that they can |